Free · 10 questions · no sign-up
Tennessee Business & Law practice test
Free practice for the Tennessee Business & Law exam: 10 original multiple-choice questions, one per business and law topic, each with the answer and an explanation. The questions are general, not Tennessee law, so pair them with the reference book your bulletin names.
Scope: general business & law, not the Tennessee exam
These questions cover business and law concepts that contractor exams commonly test, such as contracts, estimating, insurance and labor rules. They do not test Tennessee statutes, lien law or licensing rules, and they are not the trade exam. Certeo is not affiliated with any state board, PSI, Prov, Pearson VUE or NASCLA.
Your free practice
0 of 10 answered
Why might a growing contracting company choose to convert from a sole proprietorship to an LLC or corporation?
Correct answer: A. To separate personal assets from business liabilities and improve credibility with sureties and lenders
A sole proprietorship offers no liability separation between the owner's personal and business assets. Converting to an LLC or corporation creates a distinct legal entity that can shield personal assets from business liabilities and is often viewed more favorably by sureties, lenders, and larger clients.
Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 2/3 (Business Structure & Licensing) — Entity Conversion RationaleWhat is the general purpose of a pre-bid conference or job walk held before bids are due?
Correct answer: A. To allow bidders to review site conditions and ask clarifying questions before finalizing their bid
A pre-bid conference or job walk gives prospective bidders the opportunity to see actual site conditions firsthand and ask questions of the owner/design team, reducing the risk of bids based on incomplete or mistaken assumptions about the site.
Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 7 (Bidding and Estimating) — Pre-Bid ConferencesUnder OSHA fall protection rules for general construction activities, at what unprotected height above a lower level must a worker generally be protected from falling?
Correct answer: B. 6 feet
For most general construction activities, OSHA requires fall protection when working at 6 feet or more above a lower level (residential construction and some specific trades have separate/lower thresholds).
Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 12 (Jobsite Safety and Environmental Factors) — Fall Protection ThresholdWhat does 'occupancy classification' determine in a building code context?
Correct answer: B. The set of code requirements applicable based on how the building will be used
Occupancy classification (e.g., assembly, business, residential) determines which specific code provisions — exits, fire ratings, occupant load — apply to a given building.
Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 3 (Becoming a Licensed Contractor) / Ch. 9 (Scheduling and Project Management — Quality Assurance) — Life Safety RequirementsWhat is the general purpose of a notice-to-proceed (NTP) in a construction contract?
Correct answer: A. It formally authorizes the contractor to begin work and typically establishes the start date for the schedule
A notice-to-proceed is the owner's formal authorization for the contractor to begin work, and it commonly sets the official start date used to calculate the contract completion date and schedule milestones.
Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 8 (Contract Management) — Notice to ProceedWhat distinguishes an 'excusable, compensable' delay from an 'excusable, non-compensable' delay?
Correct answer: A. A compensable delay entitles the contractor to both a time extension and monetary damages; a non-compensable delay generally entitles the contractor only to a time extension
An excusable, compensable delay (typically caused by the owner) generally entitles the contractor to both additional time and recovery of related costs. An excusable, non-compensable delay (such as unusually severe weather) is beyond either party's control and generally only justifies a time extension, not monetary damages.
Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 9 (Scheduling and Project Management) — Delay ClassificationWhat is 'retainage' in a construction payment context, and why is it withheld?
Correct answer: A. A percentage of each progress payment withheld by the owner as an incentive for the contractor to complete the work and correct deficiencies
Retainage is a percentage of each progress payment (commonly 5-10%) that the owner withholds until the work is substantially or finally complete, giving the owner leverage to ensure the contractor finishes the job and resolves punch-list items.
Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 14 (Financial Management) — Retainage PurposeWhat does an 'occurrence' form general liability policy generally cover, compared to a 'claims-made' form?
Correct answer: A. An occurrence policy covers incidents that happen during the policy period, regardless of when the claim is later filed; a claims-made policy generally covers only claims filed while the policy is active
Under an occurrence policy, coverage is triggered by when the injury or damage actually happened, even if the claim surfaces years later. A claims-made policy is triggered by when the claim is reported, generally requiring the policy to be active (or extended reporting coverage in place) at that time.
Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 4 (Managing Risk) — Occurrence vs. Claims-Made CoverageWhat is the general purpose of an apprenticeship program in the construction trades?
Correct answer: A. To combine structured on-the-job training with related classroom instruction, leading to journey-level competency in a skilled trade
Registered apprenticeship programs combine paid, structured on-the-job training under a skilled worker with related classroom instruction, following a defined path toward journey-level skill and wage progression in a specific trade.
Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 11 (Employee Management) — Apprenticeship ProgramsWhat is a construction dewatering permit generally required for?
Correct answer: A. Discharging groundwater or accumulated stormwater pumped from an excavation to a storm drain or waterway
When groundwater or accumulated water must be pumped out of an excavation and discharged, a dewatering permit is typically required to ensure the discharge doesn't introduce sediment or pollutants into storm drains or nearby waterways.
Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 12 (Jobsite Safety and Environmental Factors) — Construction Dewatering Discharge
Your diagnostic
Your score
Keep going on the web
Practice every topic with all 202 questions
- 202 original questions across all 10 topics
- An explanation and a source area on every answer
- Study tools: progress saved to your account, a suggested focus topic and rounds of only the questions you missed
$39.99, one-time. No subscription or renewal; your account page shows your access date. Secure checkout by Dodo Payments; any tax is shown before you pay.
See what’s included. Web access works in any browser and is separate from the iPhone and Android apps.
Prefer your phone? Get Certeo on iPhone or Android (free to try, same one-time price in the app).
Source-area references identify the subject; they are not direct citations to each state’s laws. Confirm your board’s requirements.
Tennessee exam facts from official sources
Only facts we read on the board’s pages or the official candidate bulletin are shown. Each row names the document date. Formats and fees change, so confirm with the board before you book.
| Board | Board for Licensing Contractors |
|---|---|
| Exam | TN Contractor Business and Law |
| Test vendor | Prov (since July 1, 2026; previously PSI) |
| Format | 50 questions, 2.5 hours, 73% to pass, open book |
| As of | Prov bulletin TNCONT_CIB 2026.08.18 |
| Sources | Prov bulletin · Board: exam information |
What these questions cover
One question from each of the ten topic areas in the Certeo pack. None of them repeat the general 20-question practice test, so you can take both.
- Business Organization
- Estimating & Bidding
- OSHA Safety
- Building Codes
- Contract Law
- Project Scheduling
- Financial Management
- Risk & Insurance
- Labor & Employment
- Environmental Regulations
How to study for the Tennessee exam
- Download the current candidate bulletin from the source links above and note the exact reference book and edition.
- Answer these questions closed book to find weak topics.
- Look up each miss in the Tennessee reference, because the state rule is what the exam tests.
- Practice finding answers in the reference under time pressure if your exam is open book.
For licensing steps, fees and sources, read the Tennessee guide.
Frequently asked questions
Is this the real Tennessee Business & Law exam?
No. These 10 questions are original Certeo questions on general contractor business and law topics. They are not Tennessee-specific, not copied from any exam and not a prediction of your score. Certeo is not affiliated with any state board, exam vendor or NASCLA.
What is the format of the Tennessee Business & Law exam?
Board for Licensing Contractors: TN Contractor Business and Law. 50 questions, 2.5 hours, 73% to pass, open book (Prov bulletin TNCONT_CIB 2026.08.18). Confirm the current format in the official bulletin before you book.
Is the Tennessee exam open book?
According to the official sources we read, it is open book with the references named in the candidate bulletin. Allowed editions, tabs and notes are set by the bulletin, so read it before test day.
Who gives the Tennessee Business & Law exam?
Board for Licensing Contractors: Prov (since July 1, 2026; previously PSI), per the Prov bulletin TNCONT_CIB 2026.08.18. Register through the vendor named in the official bulletin.
Does the NASCLA exam replace the Tennessee exam?
No. In Tennessee the NASCLA exam can replace the trade exam only. The Tennessee Business and Law exam is still required.
Where can I practice more questions?
The general practice test on this site has 20 more free questions. The Certeo app for iPhone and Android has 202 original questions across 10 topics: 20 questions and 2 topics are free, and Full Access is a one-time $39.99 purchase with no subscription.
On a computer? Send this page to your phone.
Open it on your iPhone or Android phone and tap the store button there.
Practice tests for other states
- Alabama Business & Law
- California Law & Business
- Connecticut Business & Law
- Florida Business & Finance
- Georgia Business & Law
- Mississippi Law & Business
- Nevada Business & Law (CMS)
- New Mexico Business & Law
- North Carolina Business & Law
- Oregon CCB Exam
- South Carolina Business & Law
- Utah Business & Law
- Virginia Contractor Exam
Related: What is the contractor Business & Law exam? ·NASCLA reciprocity states · State guides