Connecticut Business & Law practice test

Free practice for the Connecticut Business & Law exam: 10 original multiple-choice questions, one per business and law topic, each with the answer and an explanation. The questions are general, not Connecticut law, so pair them with the reference book your bulletin names.

Scope: general business & law, not the Connecticut exam

These questions cover business and law concepts that contractor exams commonly test, such as contracts, estimating, insurance and labor rules. They do not test Connecticut statutes, lien law or licensing rules, and they are not the trade exam. Certeo is not affiliated with any state board, PSI, Prov, Pearson VUE or NASCLA.

Your free practice

0 of 10 answered

  1. Question 1 of 10Business Organization

    Which of the following is a disadvantage most commonly associated with a sole proprietorship?

    Correct answer: B. Unlimited personal liability for business debts

    A sole proprietorship has no legal separation between the owner and the business, so the owner is personally liable for all business debts and claims — the tradeoff for its administrative simplicity.

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 2/3 (Business Structure & Licensing) — Sole Proprietorship
  2. Question 2 of 10Estimating & Bidding

    A unit-price contract is most appropriate for which type of project?

    Correct answer: A. A project where exact quantities are unknown until work begins, such as earthwork or paving

    Unit-price contracts pay per measured unit of work (e.g., per cubic yard of excavation), which suits projects where quantities cannot be precisely determined until the work is performed.

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 7 (Bidding and Estimating) — Contract Pricing Methods
  3. Question 3 of 10OSHA Safety

    What is the minimum depth of a trench at which OSHA generally requires a protective system (shoring, shielding, or sloping)?

    Correct answer: C. 5 feet

    OSHA's excavation standard generally requires a protective system for trenches 5 feet deep or greater, unless the excavation is entirely in stable rock.

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 12 (Jobsite Safety and Environmental Factors) — Excavation & Trenching
  4. Question 4 of 10Building Codes

    Why must a contractor obtain a building permit before starting most construction work?

    Correct answer: B. Permits allow the jurisdiction to review plans and inspect work for code compliance

    Permits allow the local jurisdiction to review plans in advance and inspect the work in progress to verify it complies with the adopted building code, protecting public safety.

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 3 (Becoming a Licensed Contractor) / Ch. 9 (Scheduling and Project Management — Quality Assurance) — Permits & Inspections
  5. Question 5 of 10Contract Law

    What does a warranty clause in a construction contract typically guarantee?

    Correct answer: B. That workmanship and/or materials will be free of defects for a specified period

    A warranty clause commits the contractor to remedy defects in workmanship or materials that arise within a defined warranty period after completion.

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 8 (Contract Management) — Warranties
  6. Question 6 of 10Project Scheduling

    What is the purpose of a 'lag' in a construction schedule relationship between two tasks?

    Correct answer: A. A required waiting period between the end of one task and the start of a dependent task, such as concrete curing time

    Lag represents a mandatory delay built into a schedule logic tie — for example, waiting for concrete to cure before framing can begin on top of it — even though the predecessor task is otherwise complete.

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 9 (Scheduling and Project Management) — Schedule Logic
  7. Question 7 of 10Financial Management

    Why should a contractor track job costs by cost code (e.g., labor, material, subcontract, equipment)?

    Correct answer: B. It allows comparison of actual costs to the estimate to identify where a job is over or under budget

    Breaking costs into categories lets a contractor see exactly where actual spending diverges from the estimate — for example, whether labor or material overruns are driving a loss — enabling corrective action on current and future bids.

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 14 (Financial Management) — Job Costing
  8. Question 8 of 10Risk & Insurance

    Why do many owners and general contractors require subcontractors to name them as an 'additional insured' on the sub's GL policy?

    Correct answer: B. It extends a degree of liability coverage from the sub's policy to the additional insured party for claims arising from the sub's work

    Additional insured status extends coverage under the subcontractor's policy to protect the named party (owner/GC) against claims arising out of the subcontractor's work, supplementing the GC's own coverage.

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 4 (Managing Risk) — General Liability
  9. Question 9 of 10Labor & Employment

    What does 'prevailing wage' typically apply to?

    Correct answer: B. Certain public works projects, requiring workers to be paid a government-determined local wage rate

    Prevailing wage laws (e.g., Davis-Bacon at the federal level, and state equivalents) generally apply to public works projects, requiring contractors to pay locally-determined wage and benefit rates for the applicable trade classifications.

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 11 (Employee Management) — Prevailing Wage
  10. Question 10 of 10Environmental Regulations

    How should construction and demolition (C&D) debris containing hazardous materials typically be handled?

    Correct answer: B. Segregated and disposed of in accordance with hazardous waste regulations

    Debris containing hazardous materials must be identified, segregated from ordinary C&D waste, and disposed of through permitted facilities in compliance with hazardous waste regulations, not treated as ordinary trash.

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 12 (Jobsite Safety and Environmental Factors) — Waste Management

Connecticut exam facts from official sources

Only facts we read on the board’s pages or the official candidate bulletin are shown. Each row names the document date. Formats and fees change, so confirm with the board before you book.

BoardDepartment of Consumer Protection
ExamBusiness and Law Examination for contractor and dealer-technician trade licenses (bulletin read covers heating, piping and cooling)
Test vendorPSI
Format50 questions, 2 hours, 70% to pass, open book
As ofPSI bulletin updated 2/4/2026
NoteWe found no general contractor exam in Connecticut. The Major Contractor and Home Improvement registration pages we read mention no exam.
SourcesPSI bulletin

What these questions cover

One question from each of the ten topic areas in the Certeo pack. None of them repeat the general 20-question practice test, so you can take both.

How to study for the Connecticut exam

  1. Download the current candidate bulletin from the source links above and note the exact reference book and edition.
  2. Answer these questions closed book to find weak topics.
  3. Look up each miss in the Connecticut reference, because the state rule is what the exam tests.
  4. Practice finding answers in the reference under time pressure if your exam is open book.

For licensing steps, fees and sources, read the Connecticut guide.

Frequently asked questions

Is this the real Connecticut Business & Law exam?

No. These 10 questions are original Certeo questions on general contractor business and law topics. They are not Connecticut-specific, not copied from any exam and not a prediction of your score. Certeo is not affiliated with any state board, exam vendor or NASCLA.

What is the format of the Connecticut Business & Law exam?

Department of Consumer Protection: Business and Law Examination for contractor and dealer-technician trade licenses (bulletin read covers heating, piping and cooling). 50 questions, 2 hours, 70% to pass, open book (PSI bulletin updated 2/4/2026). Confirm the current format in the official bulletin before you book.

Is the Connecticut exam open book?

According to the official sources we read, it is open book with the references named in the candidate bulletin. Allowed editions, tabs and notes are set by the bulletin, so read it before test day.

Who gives the Connecticut Business & Law exam?

Department of Consumer Protection: PSI, per the PSI bulletin updated 2/4/2026. Register through the vendor named in the official bulletin.

Where can I practice more questions?

The general practice test on this site has 20 more free questions. The Certeo app for iPhone and Android has 202 original questions across 10 topics: 20 questions and 2 topics are free, and Full Access is a one-time $39.99 purchase with no subscription.

All 202 questions on iPhone and Android · Free: 20 questions, 2 topics · Full Access $39.99 one-time

On a computer? Send this page to your phone.

Open it on your iPhone or Android phone and tap the store button there.

Practice tests for other states

Related: What is the contractor Business & Law exam? ·NASCLA reciprocity states · State guides