These questions cover business and law concepts that contractor exams commonly test, such as contracts, estimating, insurance and labor rules. They do not test Florida statutes, lien law or licensing rules, and they are not the trade exam. Certeo is not affiliated with any state board, PSI, Prov, Pearson VUE or NASCLA.

Your free practice

0 of 10 answered

  1. Question 1 of 10Business Organization

    What does 'succession planning' mean in the context of a contracting business?

    Correct answer: B. Preparing for the transfer of business ownership or leadership over time

    Succession planning refers to preparing how a business will continue operating — who will take over ownership, management, and key relationships — when an owner retires, becomes disabled, or dies.

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 2/3 (Business Structure & Licensing) — Succession Planning
  2. Question 2 of 10Estimating & Bidding

    What is the purpose of requesting quotes from multiple subcontractors before finalizing a bid?

    Correct answer: B. It helps ensure competitive, accurate pricing for scope not self-performed

    Soliciting multiple sub-bids allows a general contractor to compare pricing and scope coverage, helping build an accurate and competitive overall bid.

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 7 (Bidding and Estimating) — Subcontractor Bids
  3. Question 3 of 10OSHA Safety

    Personal Protective Equipment (PPE) on a jobsite is best described as which of the following?

    Correct answer: B. Equipment used as a last line of defense after engineering and administrative controls

    The hierarchy of controls treats PPE as the last layer of protection, used after hazards have been addressed through elimination, substitution, engineering controls, and administrative controls where feasible.

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 12 (Jobsite Safety and Environmental Factors) — Hierarchy of Controls
  4. Question 4 of 10Building Codes

    What does 'occupancy classification' determine in a building code context?

    Correct answer: B. The set of code requirements applicable based on how the building will be used

    Occupancy classification (e.g., assembly, business, residential) determines which specific code provisions — exits, fire ratings, occupant load — apply to a given building.

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 3 (Becoming a Licensed Contractor) / Ch. 9 (Scheduling and Project Management — Quality Assurance) — Life Safety Requirements
  5. Question 5 of 10Contract Law

    What is the legal effect of a 'pay-if-paid' clause in a subcontract?

    Correct answer: B. The subcontractor's right to payment is conditioned on the general contractor first receiving payment from the owner

    A pay-if-paid clause shifts the risk of owner non-payment to the subcontractor by making owner payment to the general contractor a condition precedent to the sub's right to be paid (enforceability varies by state).

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 8 (Contract Management) — Payment Provisions
  6. Question 6 of 10Project Scheduling

    How does a schedule delay caused solely by unusually severe weather typically get classified?

    Correct answer: B. As an excusable, often non-compensable delay that may justify a time extension

    Severe weather beyond normal expectations is typically treated as an excusable delay — it may justify extending the schedule, but usually doesn't entitle the contractor to additional compensation, only additional time.

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 9 (Scheduling and Project Management) — Delay Types
  7. Question 7 of 10Financial Management

    What is a line of credit typically used for in a contracting business?

    Correct answer: B. Short-term borrowing to bridge cash flow gaps between expenses and payment receipt

    A line of credit provides flexible, short-term access to funds a contractor can draw on to cover payroll or material costs while waiting on customer payments, then repay as cash comes in.

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 14 (Financial Management) — Cash Flow Management
  8. Question 8 of 10Risk & Insurance

    What is a Certificate of Insurance (COI) used for?

    Correct answer: B. It is a summary document verifying that a specified insurance policy is currently in force

    A COI is a snapshot document, typically issued by an insurance agent, confirming that certain coverages are in effect as of the date issued — it is not the full policy and does not itself grant coverage.

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 4 (Managing Risk) — General Liability
  9. Question 9 of 10Labor & Employment

    What is the purpose of an apprenticeship program in the construction trades?

    Correct answer: B. To combine structured on-the-job training with related classroom instruction leading to journey-level competency

    Registered apprenticeship programs combine paid, structured on-the-job training with classroom instruction over a defined period, progressively building a worker's skill toward full journey-level competency.

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 11 (Employee Management) — Apprenticeship & Training
  10. Question 10 of 10Environmental Regulations

    What is the general purpose of erosion and sediment control measures like silt fencing on a construction site?

    Correct answer: B. To slow water flow and trap sediment before it leaves the site or enters waterways

    Erosion and sediment controls like silt fencing are physical best management practices designed to slow runoff and capture sediment on-site, preventing it from reaching storm drains or nearby waterways.

    Source area: NASCLA Contractors Guide to Business, Law and Project Management — Ch. 12 (Jobsite Safety and Environmental Factors) — Stormwater & Clean Water Act

Florida exam facts from official sources

Only facts we read on the board’s pages or the official candidate bulletin are shown. Each row names the document date. Formats and fees change, so confirm with the board before you book.

BoardConstruction Industry Licensing Board (DBPR)
ExamBusiness & Finance
Test vendorProfessional Testing, Inc. registers candidates; Pearson VUE tests them
Format120 questions, 6.5 hours, 70% to pass, open book
As ofDBPR booklet effective July 2024
SourcesDBPR booklet · DBPR exam page

What these questions cover

One question from each of the ten topic areas in the Certeo pack. None of them repeat the general 20-question practice test, so you can take both.

How to study for the Florida exam

  1. Download the current candidate bulletin from the source links above and note the exact reference book and edition.
  2. Answer these questions closed book to find weak topics.
  3. Look up each miss in the Florida reference, because the state rule is what the exam tests.
  4. Practice finding answers in the reference under time pressure if your exam is open book.

For licensing steps, fees and sources, read the Florida guide.

Frequently asked questions

Is this the real Florida Business & Finance exam?

No. These 10 questions are original Certeo questions on general contractor business and law topics. They are not Florida-specific, not copied from any exam and not a prediction of your score. Certeo is not affiliated with any state board, exam vendor or NASCLA.

What is the format of the Florida Business & Finance exam?

Construction Industry Licensing Board (DBPR): Business & Finance. 120 questions, 6.5 hours, 70% to pass, open book (DBPR booklet effective July 2024). Confirm the current format in the official bulletin before you book.

Is the Florida exam open book?

According to the official sources we read, it is open book with the references named in the candidate bulletin. Allowed editions, tabs and notes are set by the bulletin, so read it before test day.

Who gives the Florida Business & Finance exam?

Construction Industry Licensing Board (DBPR): Professional Testing, Inc. registers candidates; Pearson VUE tests them, per the DBPR booklet effective July 2024. Register through the vendor named in the official bulletin.

Does the NASCLA exam replace the Florida exam?

No. Florida's endorsement form (CILB 10) still requires the Florida Business and Finance exam and an exam covering the Florida Building Code.

Where can I practice more questions?

The general practice test on this site has 20 more free questions. The Certeo app for iPhone and Android has 202 original questions across 10 topics: 20 questions and 2 topics are free, and Full Access is a one-time $39.99 purchase with no subscription.

All 202 questions on iPhone and Android · Free: 20 questions, 2 topics · Full Access $39.99 one-time

On a computer? Send this page to your phone.

Open it on your iPhone or Android phone and tap the store button there.

Practice tests for other states

Related: What is the contractor Business & Law exam? ·NASCLA reciprocity states · State guides